Asaluyeh Monoethylene Glycol (MEG) Petrochemical Complex - Technical Profile

The Asaluyeh MEG Plant, located in Iran’s South Pars Special Economic Energy Zone, is a strategic producer of: • 1.1 million t/year monoethylene glycol (MEG) • Co-products: Diethylene glycol (DEG) and triethylene glycol (TEG) • Feedstock: Ethylene from adjacent cracker complexes
HomeProjectsAsaluyeh Monoethylene Glycol (MEG) Petrochemical Complex – Technical Profile
Project Specification

Key Specifications

Core Technology

▸ Licensed Process:

  • Shell OMEGAor Scientific Design EO/MEG technology
  • High-selectivity silver catalyst(EO conversion >85%)
  • Reactive distillationfor MEG purification

▸ Key Units:

  • Ethylene oxide (EO) reactor system
  • MEG synthesis via EO hydration

DEG/TEG separation columns

Project Details

Project Details

Market Position

  • Supplies 40% of Iran’s polyester feedstock
  • Export markets: China (60%), India (25%), Turkey (15%)
  • Competitive edge: Low-cost ethylene feedstock at ~$300/t

Sustainability & Expansion

☆ Carbon footprint: 1.8 tCO₂/t MEG
☆ Water recycling: 90% recovery rate
☆ Future projects:

  • MEG debottlenecking to 1.3 million t/y
  • Bio-MEG pilot plant (20,000 t/y)
  • CCUS integration study

Technical Specifications

✔ Process Conditions:

  • EO reaction: 200-300°C, 15-25 bar
  • MEG synthesis: 150-180°C, 10-15 bar
  • Product purity: ≥99.9% fiber-grade MEG

✔ Utility Consumption:

  • Steam: 2.3-2.8 t/t MEG
  • Cooling water: 150 m³/t MEG
  • Power: 35-40 MW

Operational Challenges

Corrosion management in EO/MEG loops (stainless steel 316L/duplex required)
Catalyst deactivation (3–5-year replacement cycle)
Glycol ether byproduct control
Winterization requirements (MEG freezing point: -13°C)

SEC Scope:

  • Design + Material take-off + Procurement + Fabrication Drawing Preparation for 20 Units Heat Exchanger 132 Tons
  • Design + Material take-off + Procurement + Fabrication Drawing Preparation for 33 Units Pressure Vessel 450 Tons
  • Design + Material take-off + Procurement + Fabrication Drawing Preparation for 8 Units Tower 420 Tons
  • Fabrication Drawing Preparation for Steel Structure 82 Tons