Bojnourd Cement Plant Expansion & Modernization
Key Specifications
Capacity & Output:
- Clinker Production:7,000 TPD (~2.3 million t/year)
- Cement Production:8,500 TPD (~2.8 million t/year)
- Product Types:
- Portland Type I/II (65%)
- Portland Pozzolana (25%)
- Specialty Cements (10%)
Process Parameters:
- Kiln Temperature:1,450°C
- Fuel Consumption:720 kcal/kg clinker
- Power Consumption:85 kWh/t cement
Alternative Fuel Usage: 15% thermal substitution
Project Details
Production Process:
- Dry Process Technologywith 5-stage preheater and pre-calciner
- Rotary Kiln Systemwith advanced combustion technology
- Vertical Roller Millsfor raw material and cement grinding
- Automated Packing and Dispatchsystems
Key Systems:
- Raw Material Preparation(limestone, clay, iron ore)
- Clinker Production Line
- Cement Grinding and Storage
- Quality Control Laboratory
Operational Challenges
Raw Material Variability: Inconsistent limestone quality requiring blending optimization
Energy Intensity: High thermal and electrical energy consumption
Emissions Control: Meeting stringent environmental standards for NOx, SOx, and dust
Maintenance Management: Rotary equipment reliability and refractory life
Strategic Importance
- Supplies 15% of regional cement demand
- Reduces import dependencyfor northern Iran construction projects
- Creates 300+ direct jobsin underdeveloped region
- Promotes use of alternative fuelsfrom agricultural waste
Engineering Opportunities for Sabz Engineering Co.
✅ Detailed Engineering:
- Structural designfor equipment foundations and buildings
- Pressure vessel designfor cyclones and heat exchangers
- Material handling systemsdesign for raw materials and finished products
✅ Software Solutions:
- Process optimization softwarefor energy efficiency
- Predictive maintenance systemsfor rotary equipment
- Quality control data managementsystems
✅ Project Management:
- Phased construction planningto maintain production
- International equipment procurementcoordination
- Commissioning and startupmanagement
Sustainability Features
Waste Heat Recovery: 8 MW power generation from kiln exhaust gases
Alternative Fuel Use: 15% thermal substitution with agricultural waste
Water Recycling: 90% process water reuse
Dust Emission Control: <10 mg/Nm³ with bag filters
Why This Project Fits Sabz Engineering Co.
- Leverages structural and mechanical design expertise
- Opportunities for energy optimization software development
- Experience in industrial project management
- Aligns with sustainable engineering practices
Project Economics
Parameter | Value |
Investment | $250 million |
Payback Period | 4-5 years |
ROI | 22-25% |
Cost Reduction | 15% energy cost savings |
Technical Comparison: Before vs After Modernization
Parameter | Existing | New |
Capacity | 3,500 TPD | 7,000 TPD |
Energy Use | 850 kcal/kg | 720 kcal/kg |
CO2 Emissions | 0.85 t/t cement | 0.72 t/t cement |
Automation | Manual control | Full DCS |
SEC Scope:
- Design + Material take-off + Fabrication Drawing Preparation for 100 Tons Duct & Miscellaneous