Capacity & Configuration:
- Total Storage Capacity:5 million m³
- Tank Sizes:50,000 to 120,000 m³ per tank
- Product Types:
- Condensate (60%)
- Naphtha (20%)
- Gasoil (15%)
- Specialty chemicals (5%)
Design Parameters:
- Design Standards:API 650, API 653
- Operating Pressure:Atmospheric to 0.5 barg
- Temperature Range:-10°C to 80°C
- Corrosion Protection:Cathodic protection and advanced coatings
Project Details
Storage Technology:
- Floating Roof Tanksfor condensate and light crude
- Fixed Roof Tankswith internal floating decks for refined products
- Double-Wall Tanksfor environmental protection
- Advanced Leak Detection Systems
Key Systems:
- Pipeline Integrationwith jetties and processing facilities
- Vapor Recovery Units(VRU)
- Fire Protection and Safety Systems
- Automated Inventory Management
Operational Challenges
Product Contamination Control: Managing multiple products in shared infrastructure
VOC Emissions Control: Meeting stringent environmental regulations
Geotechnical Considerations: Soil stabilization in coastal area
Emergency Response: Large-scale spill containment and fire safety
Strategic Importance
- Enables export flexibilityfor South Pars condensate production
- Provides strategic storagefor production optimization
- Reduces shipping coststhrough larger vessel loading
- Supports downstream petrochemical operations
Engineering Opportunities for Sabz Engineering Co.
Detailed Engineering:
- Tank foundation designfor challenging soil conditions
- Pipeline stress analysisfor transfer systems
- Structural designfor access platforms and piping supports
Software Solutions:
- Inventory Management Systemintegration
- Leak Detection and Monitoring Software
- Predictive Maintenancefor rotating equipment
Project Management:
- Modular constructionplanning
- International procurementof specialized equipment
- Commissioning and startupmanagement
Sustainability Features
Vapor Recovery: 98% VOC capture efficiency
Solar-powered monitoring systems
Advanced wastewater treatment
Spill prevention and containment systems
Project Economics
Parameter | Value |
Investment | $380 million |
Payback Period | 5-6 years |
ROI | 20-22% |
Operational Cost Savings | 15% compared to scattered storage |
Technical Comparison: Phase I vs Phase II
Parameter | Phase I | Phase II |
Total Capacity | 1.8 million m³ | 2.5 million m³ |
Automation Level | Basic | Advanced DCS |
VOC Recovery | 85% | 98% |
Safety Systems | Conventional | SIL-2 Certified |
SEC Scope:
- Design + Material take-off + Fabrication Drawing Preparation for 12 Units Storage Tanks 30,000 Tons