Esfahan Gasoline Production Project - Technical Profile

The Esfahan Gasoline Production Project is a major refinery upgrade initiative at the Esfahan Oil Refinery, designed to: • Boost gasoline output to meet domestic demand • Improve fuel quality to Euro-5 standards • Utilize advanced refining technologies for higher efficiency
HomeProjectsEsfahan Gasoline Production Project – Technical Profile
Project Specification

Key Specifications

Key Specifications:
✔ Capacity Expansion:

  • Gasoline production increase:+8 million liters/day
  • Octane improvement:91-95 RON
  • Sulfur reduction:<10 ppm (from ~500 ppm)

✔ Project Scope:

  • Naphtha hydrotreating unit (NHT)
  • Continuous catalytic reforming (CCR)
  • Isomerization unit
  • Oxygenate blending facilities
Project Details

Project Details

Technical Specifications

✔ Process Conditions:

  • NHT Unit:300-380°C, 30-45 bar
  • CCR Unit:500-530°C, 5-15 bar
  • Isomerization:120-180°C, 20-30 bar

✔ Utility Requirements:

  • Hydrogen consumption:120-150 Nm³/ton feed
  • Power demand:~45 MW
  • Cooling water:200 m³/ton product

Core Technology

▸ Licensed Processes:

  • UOP CCR Platforming™for high-octane reformate
  • Axens Prime-G+™for naphtha hydrodesulfurization
  • Penex™ isomerization(for light naphtha upgrading)

▸ Key Equipment:

  • Fixed-bed hydrotreating reactors
  • Regenerative catalytic reformers
  • Isomerization reactors with chlorided alumina catalyst

Operational Challenges

Catalyst management in high-sulfur feed conditions
Corrosion control in hydroprocessing units
Energy optimization in reforming section
Product quality consistency with varying crude slates

 

Market & Strategic Impact

  • Eliminates 15% of Iran’s gasoline imports
  • Enables 100% Euro-5 compliancefor Esfahan output
  • Reduces benzene contentto <1% vol

Sustainability Features

☆ Waste reduction:

  • 9% sulfur recovery (Claus + TGU units)
  • Zero liquid discharge (ZLD) water treatment

☆ Carbon footprint reduction:

  • 15% lower CO₂/ton vs. legacy units
  • Waste heat recovery (25 MW thermal)

 

SEC Scope:

  • Design + Procurement + Fabrication Drawing Preparation for 106 Units of Air Cooler
  • Design + Procurement + Fabrication Drawing Preparation for 28 Units of pressure Vessel
  • Design + Procurement + Fabrication Drawing Preparation for 41 Units of Tower
  • Design + Procurement + Fabrication Drawing Preparation for 6 Units of Heat Exchanger