Ghadir Petrochemical Complex - Urea & Ammonia Unit 1 Profile

 Located in Asaluyeh, Iran, Ghadir Petrochemical’s first urea/ammonia unit is a cornerstone of Iran’s fertilizer production with:

  • Ammonia capacity: 1,155,000 t/year
  • Urea capacity: 1,980,000 t/year
  • Technology providers: Ammonia (Haldor Topsoe), Urea (Stamicarbon CO₂ stripping)
HomeProjectsGhadir Petrochemical Complex – Urea & Ammonia Unit 1 Profile
Project Specification

Key Specifications

Process Technology:
▸ Ammonia Unit:

  • Natural gas-fed primary + secondary reforming
  • KAAPplus technology (Kellogg Advanced Ammonia Process)
  • Energy consumption: 6.7 Gcal/t ammonia (Topsoe benchmarks)

▸ Urea Unit:

  • Stamicarbon’s CO₂ stripping process
  • MPR reactor technology for corrosion control
  • Granulation vs. prilling capabilities

Technical Specifications:
✔ Pressure Levels:

  • Synthesis gas compression: 150 bar
  • Urea synthesis: 145 bar, 185°C

 

Project Details

Project Details

Corrosion management in urea synthesis loop (Titanium/Zirconium lined equipment)
Catalyst life optimization (Ru-based ammonia catalyst)
NOx emissions control from reformers
Prill tower dust suppression

Sustainability Features:
☆ Wastewater reduction: 0.2 m³/ton urea (vs. industry 0.5 m³)
☆ Carbon footprint: 0.85 tCO₂/ton urea product
☆ Waste heat recovery: 25 MW thermal energy

Market Position:

  • Supplies 20% of Iran’s urea exports
  • Key export markets: India, Brazil, Africa
  • Feedstock advantage: South Pars gas at $0.15/m³

✔ Key Equipment:

  • 3-stage centrifugal compressors (MW-class drivers)
  • Pool condenser design for urea
  • Dual-pressure waste heat boiler

Energy & Utilities:

  • Steam consumption: 1.35 ton/ton urea
  • Cooling water: 120 m³/ton urea
  • Power demand: 45 MW (self-generated + grid)

 

Expansion Projects:
• Debottlenecking to 2.2 million t/year urea
• Urea-formaldehyde value-added product line
• Green ammonia pilot plant (5,000 t/year)

Data Sources:

  • Stamicarbon process manuals
  • Topsoe ammonia technology reports
  • NPC Iran annual performance data

SEC Scope:

  • Design + Procurement + Fabrication Drawing Preparation for 34 Units of Pressure Vessel 180 Tons
  • Design + Procurement + Fabrication Drawing Preparation for 29 Units of Heat Exchanger 120 Tons
  • Design + Procurement + Fabrication Drawing Preparation for 34 Units of Tower 980 Tons
  • Design + Procurement + Fabrication Drawing Preparation for 4 Units of Reactor 520 Tons
  • Design + Procurement + Fabrication Drawing Preparation for 2 Units of Stack 110 Tons
  •  
  • Material take-off + Procurement + Fabrication Drawing Preparation for 1 Unit Reformer 1,040 Tons (Steel Structure)
  • Design + Procurement + Fabrication for Ducts & Miscellaneous 300 Tons

Fabrication Drawing Preparation for Steel Structure 2,350 Tons