Kermanshah Urea and Ammonia Petrochemical Complex Profile

The Kermanshah Urea and Ammonia Petrochemical Complex is one of Iran’s strategic petrochemical facilities, located in the industrial zone of Kermanshah province in western Iran. As a key player in Iran’s petrochemical industry, this complex specializes in the production of agricultural and industrial fertilizers with an annual capacity of 500,000 tons of urea and 300,000 tons of ammonia.
HomeProjectsKermanshah Urea and Ammonia Petrochemical Complex Profile
Project Specification

Key Specifications

Key Specifications:

  • Advanced Technology:Utilizes modern Haber-Bosch process for ammonia synthesis and state-of-the-art urea production technology
  • Environmental Compliance:Implements strict environmental protection measures in all production processes
  • Strategic Location:Benefits from proximity to natural gas resources and access to domestic/export markets

Operational Challenges:

  • Energy consumption optimization in synthesis loops
  • Maintenance of high-pressure vessels and heat exchangers

Catalyst management and replacement cycles

Project Details

Project Details

Production Capacities:

  • Ammonia Unit:1,000 tons per day (tpd) production capacity
  • Urea Unit:1,700 tpd production capacity
  • Supporting Facilities:Includes dedicated utilities, storage tanks, and loading terminals

Technical Characteristics:

  • High-pressure process equipment (operating at 150-300 bar)
  • Advanced process control systems
  • Energy-intensive production processes requiring optimization

Development Potential:

  • Capacity expansion through debottlenecking projects
  • Implementation of energy recovery systems
  • Diversification into value-added downstream products
  • Potential for carbon capture and utilization technologies

Market Position:

  • Supplies domestic agricultural markets
  • Exports to regional markets including Iraq and Turkey
  • Part of Iran’s petrochemical value chain

 

SEC Scope:

  • Design + Procurement + Fabrication for 3 Units of Stack 100 Tons
  • Material take-off + Procurement + Fabrication Drawing Preparation for 1 Unit Reformer 850 Tons (Steel Structure)
  • Design + Procurement + Fabrication for Ducts & Miscellaneous 175 Tons