Pardis Petrochemical Complex – 2nd Urea & Ammonia
Key Specifications
Core Technology & Licensing
Licensed Processes:
- Ammonia Production:Haldor Topsoe’s conventional reforming technology
- Urea Synthesis:Stamicarbon’s CO₂ stripping process
- Natural Gas Treatment:BASF’s gas purification technology
Key Production Units:
- Ammonia Unit(1.75 million t/year)
- Urea Unit(2.85 million t/year)
- Utilities and Off-sites(power generation, water treatment)
Project Details
Capacity & Output:
- Ammonia Production:5,000 t/day
- Urea Production:7,800 t/day
- By-products:Carbon dioxide (for urea synthesis)
Process Conditions:
- Ammonia Synthesis:450-500°C, 150-200 bar
- Urea Synthesis:180-190°C, 140-150 bar
Reformer Operation: 800-900°C, 30-40 bar
Operational Challenges
Catalyst Management: Frequent replacement of reformer and ammonia synthesis catalysts
Energy Intensity: High natural gas consumption (∼30 Gcal/t ammonia)
Corrosion Control: Handling of corrosive intermediates (e.g., carbamate)
Environmental Compliance: Managing NOx emissions from reformers
Strategic Importance
- Largest urea producer in Iran(∼20% of national output)
- Key exporterto markets in Asia, Africa, and Latin America
- Integrated value chainfrom natural gas to fertilizers
- Job creation and economic developmentin the region
Engineering Opportunities for Sabz Engineering Co.
Detailed Engineering:
- Design of high-pressure vessels(urea reactors, ammonia converters)
- Pipe stress analysisfor high-temperature/pressure lines
- Foundation designfor large rotating equipment (compressors)
Software Solutions:
- Process Optimization Toolsfor energy reduction
- Asset Integrity Managementfor corrosion monitoring
- Digital Twinfor predictive maintenance
Project Management:
- Phased turnaround planning
- Vendor coordinationfor international equipment procurement
- Construction managementfor brownfield expansions
Sustainability Features
Carbon Capture: Utilization of CO₂ for urea production
Water Recycling: Advanced water treatment for zero liquid discharge
Waste Heat Recovery: Cogeneration of power and steam
Emissions Reduction: Advanced burners for NOx control
Why This Project Fits Sabz Engineering Co.
- Aligns with core competencies:Pressure vessel design, energy optimization, and project management
- Software innovation opportunities:Development of custom tools for process efficiency
- Proven experience:Similar projects executed in urea/ammonia complexes
Project Economics
Parameter | Value |
Investment | ~$1.5 billion (initial phase) |
Payback Period | 5-6 years |
ROI | 20-25% |
Employment | 1,500+ direct jobs |
SEC Scope:
- Design + Procurement + Fabrication Drawing Preparation for 27 Units of Pressure Vessel 180 Tons
- Design + Procurement + Fabrication Drawing Preparation for 13 Units of Tower 320 Tons
- Design + Procurement + Fabrication Drawing Preparation for 10 Units of Air Coolers 200 Tons
- Material take-off + Procurement + Fabrication Drawing Preparation for 1 Unit Reformer 1,040 Tons (Steel Structure)
- Fabrication Drawing Preparation for Steel Structure 2,350 Tons